Trade Sync was contracted once again by the City of Burlington to survey new transit shelter sites through the City of Burlington.
This included the following:
- Surveying of all sites
- Placement and layout of Transit Shelter Stops
- Technical drawings and Layout
- Excavation and concrete work for transit shelters, walkways and landings
- Retaining walls