Check out some of Recent Projects

We would be happy to make your next project a success too.

Go-Transit Aurora installs new canopy

Go Transit realizes that the York Region is becoming one of the fastest growing areas in Canada and is investing in a large five-level parking facility that will feature green vehicle parking, “white roof” and many entry points. The new parking structure received an extended entrance way which was installed by Trade Sync. 

Bingham Loop New Canopy – TTC

The TTC Bingham Loop has existed since 1922 and has since only receive one upgrade in 1954. However in the October 2010 the Loop was rebuild to include new pavement, reconstruction of street car track, new seating and new over head canopy structure.  Trade Sync installed

Phase 3 of the BRT – Calgary

The City of Calgary maintains its commitment to providing commuters a raid bus line to get downtown. The BRT is in its third phase of expanding it 15 minute service. This year, new red BRT shelters were installed by Trade Sync at three locations.

Site Surveys for 120 Couche-Tard Stores

The purpose with any site survey is to ensure that there is good coordination between those who are making the specification, those installing and those who are requesting. Working with Store Image, Trade Sync was hired to conduct over 120 site survey

TTC installation of NVAS

The next level of customer service has arrived at TTC. The NVAS “next vehicle arrive system” screens show when the next vehicle will arrive at an individual transit shelters. The LED screens installed by Trade Sync